PERT Estimator

Three-point estimation using optimistic, most likely, and pessimistic durations.

Inputs

Results

Expected Duration (days)
8.67
TE = (O + 4M + P) / 6
Standard Deviation
1.67
σ = (P − O) / 6
Variance
2.78
σ²

Confidence Ranges

68% (±1σ)7.0010.33 days
95% (±2σ)5.3312.00 days
99.7% (±3σ)3.6713.67 days